Two metal elephant sculptures inside SAT-1.
Elephant sculptures in SAT-1 at Suvarnabhumi. Photo: Nord794ub / Wikimedia Commons, CC BY-SA 4.0. The image has been cropped, resized and converted to WebP from the original.Photo: Nord794ub / Wikimedia Commons · CC BY-SA 4.0
Image source and edits

Midfield Satellite SAT-1. Existing crop, resize and WebP conversion from WordPress. The image adaptation is covered by CC BY-SA 4.0.

SAT-1 at Suvarnabhumi: how the satellite terminal works

Reworked with AI assistance. The Swedish text, image and caption were reviewed and approved by Johan Lundgren. Sources were checked on 14 November 2026.

Flying from Suvarnabhumi in Bangkok and assigned a gate in SAT-1? The satellite terminal is connected to the main terminal by an automated train. Here is an overview of how to reach your gate and why both 2023 and 2025 appear as opening years.

What is SAT-1?

SAT-1 is a separate terminal building for aircraft gates, connected to Suvarnabhumi’s main terminal. According to the airport operator Airports of Thailand, AOT, the building has 28 contact gates. At its opening, it was described as increasing the airport’s annual capacity from 45 to 60 million passengers. This is a capacity figure, not a measure of how many people actually travel through the airport. Source

Getting to a departure from SAT-1

AOT’s guidance for international departures describes the following sequence:

  1. Start in the main terminal with check-in, security screening and passport control.
  2. Follow the signs for gates S101–S128. The route to the train is behind the large sculpture group depicting the Churning of the Ocean of Milk.
  3. Take the automated train, APM, to SAT-1. Then go up to the departures level on floor 3 and follow the signs to your gate.

This guidance applies to departures from Bangkok. If you are changing flights, follow the instructions for your connection. Always check your gate on the airport’s information screens and follow your airline’s instructions on when to be there. Source

The train between the buildings

The link between the main terminal and SAT-1 runs underground. The train is driverless and the station in SAT-1 is on basement level B2. Although the train journey itself is short, allow time for checks, walking and finding the right gate. Source

Did the terminal open in 2023 or 2025?

TAT announced that SAT-1 would start receiving flights on 28 September 2023. AOT then described the terminal and its passenger services in December of that year. Source Source

A later royal inauguration ceremony for SAT-1 and the third runway was announced for 20 March 2025. The ceremony should therefore not be confused with the start of passenger operations. Source

Sources & scope

← Back to home